New Our Toronto office is open. Read the announcement
Our specialty

Unfinished goods, delivered in the order you'll build them

Finished product sits on a shelf. Parts sit on your critical path. We run inbound freight for manufacturers who do final assembly in North America, and we plan it like a production schedule.

The problem

One missing part stops the whole line

You can have 98% of a product's parts in the building and still build zero units.

Most forwarders treat production parts like any other cargo. Each supplier books its own shipment, the containers arrive whenever they arrive, and your receiving team spends two days breaking down pallets to find the one carton of screws you're short.

We started Fiskers in 2013 to fix exactly that for one appliance maker in Illinois. It's still the work we're best at.

How it flows

Many suppliers in, one planned delivery out

Motor supplier · Ningbo PCB supplier · Shenzhen Housings · Dongguan Harnesses · Huizhou Packaging · Shenzhen Fiskers origin hub Count · inspect · kit Load in build sequence 1 × 40' HC ~30 days door to door Customs pre-cleared Your line Dongguan / Yantian US or Canada
What's included

Tools we use, depending on your plant

Not every client needs all of these. We usually start with consolidation and add the rest once we understand how your line runs.

01

Multi-supplier consolidation

We collect from each supplier on a milk run, reconcile against your PO, and ship one container instead of several half-empty ones.

02

Kitting at origin

Parts are grouped into kits per unit or per batch, matched to your bill of materials, and packed in your returnable totes or our cartons.

03

Build-sequence loading

Containers are loaded so the parts for week one come out of the door first. Your receiving team unloads straight to line-side staging.

04

Shortage alerts at origin

If a supplier short-ships, you know the day we pick up, while there's still time to fly the missing part or reorder.

05

Vendor-managed buffer

Safety stock of critical parts held in our Chicago or Toronto warehouse and released on your call-off or kanban signal.

06

Returnable packaging loop

Empty totes, dunnage and racks shipped back to suppliers in China instead of being bought new every run.

Assembly line with parts delivered line-side in totes
Results

What clients see after six months

−31%
Inbound freight cost per unit built (median)
−5days
Parts inventory on hand
0
Line stoppages from missing inbound parts (most clients)
1
Weekly delivery instead of 5–8 separate ones

Median figures across 12 production-logistics clients onboarded 2023–2025, comparing the six months before and after.

Case study: 9 days of line-side wait cut to 2
Good fit?

This service works best if…

  • You do final assembly, configuration or packaging in the US or Canada
  • You buy parts from three or more suppliers in China or Vietnam
  • You ship at least two containers a month of parts, or plan to
  • A missing part costs you more than the freight to fly it
  • You're tired of your receiving team playing detective

Not quite there yet? Plenty of clients start with buyer's consolidation on a single product line and grow from there.

Have a production schedule we should see?

Send us your PO dates and lane details. A planner (not a bot) will come back with routing options and a rate within one business day.